beBee background
المحترفون
>
Muscat
BOUTLiKHET AMiNE QC E&i Engineer

BOUTLiKHET AMiNE QC E&i Engineer

Electrical / Instrumentation / Cathodic Protection

مرافق / طاقة

Muscat, محافظة مسقط

اجتماعي


الخدمات المقدمة

Responsible for ensuring that the quality management system (QMS) is fully implemented in an 
organized and efficient manner.
» Responsible for all electrical & instrument related to installation, testing, and commissioning.
» Responsible for preparing QMS documents.
» Responsible for conducting the inspection of all ongoing activities for electrical & instrument installation.
» Responsible for raising RFIs and conducting all electrical & instrument & telecom with client 
representative.
» Responsible for conducting the inspection of all electrical & instrument material before storage, 
installation and after installation.
» responsible for raising NCR, SDR and initiating corrective action if the work was done is not as per 
specification, method statement or as per approved shop drawing.
» Report to the Project Manger on any deficiencies in the operation of quality Management & control 
system.
» Responsible for ensuring that the work was done is per project specification, method statement, and 
as per approved shop drawing. Also, to ensure, to ensure that all approved and inspected materials 
are used.

» Responsible for reviewing the IFC drawing and inspection documents and ensuring to comply with 
the Royal commission requirements.
» Preparing daily weekly QA/QC Reports for ongoing activates.
» Responsible for ensuring all activates are as per IFC drawing and RC standards.
» Responsible for ensuring all the testing equipments are calibrated.
» Responsible for performing all the required tests for LV, MV, control cables, and equipment before 
and after installation.
» Responsible for all telecom systems inspections.
» Responsible for ensuring the OTDR test of fiber optic cables.
» Responsible for all protection cathodic system inspections.
» Responsible for preparing the handover documents O&M manuals.
» Responsible for preparing shop drawings, material-technical submittals, and technical queries.
» Rendered technical drawings and electrical systems specifications that exceeded company standards.
» Troubleshoot electrical equipment problems such as electro-valves and sensors.
» Performed load calculation for sizing wire and circuit protection.
» Monitored installation and operations to consistently meet rigorous customer requirements.
» Mentored junior engineers and new hires to better improve the competency and efficiency of all staff.
» Continually improved methods and procedures for processes, measurement, documenting, and 
workflow techniques.

السعر التقريبي: ر.ع. 17 لكل ساعة

الخبرة

QA/QC E&I ENGINEER (leader) | LTHE: LARSEN&TOUBRO HYDROCARBON ENRGY 
Timimoun SOUTHWEST GAS FIELD DEVELOPMENT-TNK-HTJ-HBH
03-02-2021 – 03-06-2023.
My responsibilities on the project included the following:
» Responsible for ensuring that the quality management system (QMS) is fully implemented in an 
organized and efficient manner.
» Responsible for all electrical & instrument related to installation, testing, and commissioning.
» Responsible for preparing QMS documents.
» Responsible for conducting the inspection of all ongoing activities for electrical & instrument installation.
» Responsible for raising RFIs and conducting all electrical & instrument & telecom with client 
representative.
» Responsible for conducting the inspection of all electrical & instrument material before storage, 
installation and after installation.
» responsible for raising NCR, SDR and initiating corrective action if the work was done is not as per 
specification, method statement or as per approved shop drawing.
» Report to the Project Manger on any deficiencies in the operation of quality Management & control 
system.
» Responsible for ensuring that the work was done is per project specification, method statement, and 
as per approved shop drawing. Also, to ensure, to ensure that all approved and inspected materials 
are used.

Responsible for reviewing the IFC drawing and inspection documents and ensuring to comply with 
the Royal commission requirements.
» Preparing daily weekly QA/QC Reports for ongoing activates.
» Responsible for ensuring all activates are as per IFC drawing and RC standards.
» Responsible for ensuring all the testing equipments are calibrated.
» Responsible for performing all the required tests for LV, MV, control cables, and equipment before 
and after installation.
» Responsible for all telecom systems inspections.
» Responsible for ensuring the OTDR test of fiber optic cables.
» Responsible for all protection cathodic system inspections.
» Responsible for preparing the handover documents O&M manuals.
» Responsible for preparing shop drawings, material-technical submittals, and technical queries.
» Rendered technical drawings and electrical systems specifications that exceeded company standards.
» Troubleshoot electrical equipment problems such as electro-valves and sensors.
» Performed load calculation for sizing wire and circuit protection.
» Monitored installation and operations to consistently meet rigorous customer requirements.
» Mentored junior engineers and new hires to better improve the competency and efficiency of all staff.
» Continually improved methods and procedures for processes, measurement, documenting, and 
workflow techniques.

التعليم

Electrical engineering 

محترفون من نفس قطاع مرافق / طاقة مثل BOUTLiKHET AMiNE QC E&i Engineer

محترفون من قطاعات مختلفة بالقرب من Muscat, محافظة مسقط

المستخدمون الآخرون الذين يطلق عليهم BOUTLiKHET